First Boats Nearing Completion

The first boats in the new fleet are nearing completion and have been put into the water for final rigging and fitting out. Check out these pictures that Clipper have released:

About to Get Wet for the First Time!

About to Get Wet for the First Time!

Completed hull and deck being lowered into the water for the first time before all the mast and rigging are fitted.

The picture doesn’t really give the true impression as to the size.

 

 

 

 

Galley Area

Galley Area

Picture of the galley area. Way bigger than anything I’ve been used to – probably more worktop space here than there is in my kitchen at home. Mind you if you’re cooking for 20 you’re going to need it!

Interesting that they already have the tidy pockets fitted to the hull sides……

 

 

 

Sail Locker

Sail Locker

 

Sail locker looking back from the bow (pointy end). Note the 4 bunks that are already installed – hope I don’t draw one of those!! Not going to be pleasant trying to get some kip in there in either the tropics or a blow!

You can see why it’s called the Ghetto now.

 

 

 

 

That's a LOT of deck!

That's a LOT of deck!

 

That is a LOT of deck space! Going to need my GPS just to find the bow!!

 

Wonder if that’s the installation manual next to the winch…..?

Tags:

Leave a Reply

Your email address will not be published. Required fields are marked *

*

code

My Clipper 13-14 Adventure